Vehicle Repair Equipment & Tools

Auto Accessories/Car Accessory Snap in Tr414 Tubeless Tire Rubber Valve

Cangzhou Bomai Automobile Accessories Co., Ltd.
  • Type:Tire Inflators
  • Standard:Standard
  • Certification:ISO, CE, GS, RoHS
  • Tire Gauges Type:Tr414 Tyre Valve
  • Tire Gauges Carry Way:Tr414 Tire Valve
  • Condition:New

Base Info

  • Model NO.:TR414
  • Update Method:Tyre Valve
  • Description:Tr414 Tyre Valve
  • Valve Stem Material:Aluminum Alloy; Zinc Alloy; Copper
  • Valve Cap Material:Natural Rubber; EPDM Rubber
  • Valve Core Material:Plastic Cap
  • Package:100PCS,Bag, 10bag,CTN
  • Carton Size:31*21*22cm
  • Trade Terms:Fob,CIF,CFR,etc
  • Capacity:100,000PCS,Day
  • Quality Test:100% Leaking Test
  • Warranty:1 Year
  • Usage:Inflate and Deflate for The Car Tyre
  • Certificates:ISO
  • Payment Terms:T,T; L,C at Sight or Negotiable
  • Place of Origion:China Mainland
  • Transportation:by Sea,by Air, by Train
  • Transport Package:Neutrial Package
  • Specification:BM-TR414
  • Trademark:BoMai
  • Origin:China Mainland
  • HS Code:8481300000
  • Production Capacity:100000,Day

Description

Basic Info.

Model NO. TR414 Update Method Tyre Valve Description Tr414 Tyre Valve Valve Stem Material Aluminum Alloy; Zinc Alloy; Copper Valve Cap Material Natural Rubber; EPDM Rubber Valve Core Material Plastic Cap Package 100PCS/Bag, 10bag/CTN Carton Size 31*21*22cm Trade Terms Fob,CIF,CFR,etc Capacity 100,000PCS/Day Quality Test 100% Leaking Test Warranty 1 Year Usage Inflate and Deflate for The Car Tyre Certificates ISO Payment Terms T/T; L/C at Sight or Negotiable Place of Origion China Mainland Transportation by Sea/by Air/ by Train Transport Package Neutrial Package Specification BM-TR414 Trademark BoMai Origin China Mainland HS Code 8481300000 Production Capacity 100000/Day

Product Description

repair tools /auto accessories snap in TR414 tubeless tire rubber valve 


Produts description
Auto Accessories/Car Accessory Snap in Tr414 Tubeless Tire Rubber Valve
 
NameTR414 tyre valve 
 
Valve stem Materialzinc alloy; copper;aluminum 
 
Valve cap materialnatural rubber; EPDM rubber 
 
Valve core materialcopper; zinc alloy
 
Other modelsTR412;TR413, TR414C,TR415,TR418,TR423,
TR425,TR438,TR525,etc
Package100pcs/bag , 10bag/ctn
 
Payment termsT/T; L/C;D/P, etc
 
Car fitmentUniversal
Place of originChina Mainland
Warranty1 year
Quality test100% leaking test
DeliveryBy sea
UsageFor car
Sample offeredavailable 
MOQ100,000 pcs
capacity100,000pcs/day 
 Products details:

Auto Accessories/Car Accessory Snap in Tr414 Tubeless Tire Rubber Valve
Auto Accessories/Car Accessory Snap in Tr414 Tubeless Tire Rubber Valve
Auto Accessories/Car Accessory Snap in Tr414 Tubeless Tire Rubber Valve



Delivery time: 
 
Quantity(pcs)1-20002000-50005000-20,000>20000
Estimate time5715Negotiable as to your request

Package details: 
 
ItembagCarton20'containerCarton Size(mm)
TR414100pcs/bag1000pcs/carton20,000pcs31*21*22 CM(for 1000 pcs)
 
TR414100pcs/bag200pcs/carton2000,000pcs38*29*25CM(for 2000 pcs)
 
 


Auto Accessories/Car Accessory Snap in Tr414 Tubeless Tire Rubber Valve

About Us 
Cangzhou Bomai automobile accessaries CO.,Ltd is found in 2000, located in Xian Country, Cangzhou city, the hometown of  Tyre Valve in China. We are specialized in a various of  tire valves, wheel balance weight, sealing strings, auto tools etc. ISO9001:2000 quality system management standard and constantly develop new products to meet customer' s demand. Our products have been exported more than 150 countries like Mexico, Brazil, Russia, south Korea, Japan, South Africa etc and have universally well received good reputation from all over the world customers. Therefore, We are sincerely looking forward to make cooperation with you.


FAQ: 
Q1. What is your terms of packing?
A: Generally, we pack our commodities in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A:T/T and L/C are often used. But it can be negotiable according to both parties situation. We'll show you the photos of the products and packages
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The actual delivery time depends on the items and the quantity of your order.

 
Q5: Do you test all your goods before delivery?
A: Yes, we have quality control all through our production and have final inspection by QC with AQL standard before shipment.

 
Q6. Do you offer free samples? 
Yes, we do. But the freight would be on the buyer's expense. 

 
Mr Don Dong